Shark 100B Specifications Page 37

  • Download
  • Add to my manuals
  • Print
  • Page
    / 114
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 36
e
Electro Industries/GaugeTech
Doc #: E145701 4-3
4.3:
CT
Leads
Pass
Through
(No
Meter
Termination)
Q
The second method allows the CT wires to pass through the CT Inputs without terminating at the
meter. In this case, remove the Current Gills and place the CT wire directly through the CT opening.
The opening will accomodate up to 0.177” / 4.5mm maximum diameter CT wire.
Current Gills
removed
CT Wire passing through meter
Figure 4.2: Pass-Through Wire Electrical Connection
Page view 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 113 114

Comments to this Manuals

No comments